White Tab 001 — Master Timeline (Facts-Only)

GUARDRAIL: WHITE — FACT REPOSITORY ONLY

Facts & source pinpoints only. No strategy, no argument, no legal opinions. All quotations are "as reported" unless exact text appears in a cited source.


PART A — Scope & Use (facts-only)

Chronological index of key events for 226 Franklin St., Apt. G21 (entrance 97 Green St.), Brooklyn, NY 11222. Each entry cites the controlling White tab and includes Bates/page pinpoints where available, or "(PDF p. TBD)" with a Task ID for follow-up. This document integrates the Scope Manipulation Evidence Arc details from WT-114, enhancing entries for the court-ordered scope, field instruction divergence, PRV certification, and professional audit findings.

v2.4 Note: July 2023 events are indexed in chronological order of discovery/occurrence: B.4.1 rainstorm re-flood discovery (07-12), B.4.2 SERVPRO valve break (07-13), B.4.3 visible mold documentation window (07-12 to 07-17). See WT-116 v1.2 for detailed breakdown.

v2.4.4 Note: Re-flood entry date corrected from "~2019-10-25 → ~2019-10-31" to "~2019-12-08" per WT-116 v1.7. Source: FLOOD-EMAIL-078 (Jun 18, 2020) explicitly states "second flood on December 8th." Description updated with exhaust vent mechanism detail.


PART B — Master Timeline (chronological)

Legend: Src = White source tab(s). Pin = PDF page pinpoints (or "TBD" + task). Bates/Notes = production ranges or mechanical notes.

Dates are ISO unless the exact day is unknown (then "~" or "mid/late" is used).

Date Event (facts-only) Participants / Parties Location Src Pin Bates / Notes
2019-10-13 Trigger flood event affecting G21. Gray; American Package Co./Kofman G21 WT-104; WT-103 (PDF p. TBD) → 001-PIN-104-TRIG Carrier claim file to map.
~2019-10-15 → ~2019-10-22 Common hallway "2-foot cut" by landlord's team (within days of trigger). Owner's contractor(s) Common hall WT-113 (PDF p. TBD) → 001-PIN-113-2FT Separate from in-unit self-mitigation.
2019-10-17 → 2019-10-24 Tenant self-mitigation — commercial dehumidifier rental (Home Depot #1255). Gray G21 WT-113 (PDF p. TBD) → 001-PIN-113-BANK; 001-PIN-113-EXIF Bank lines: 10/17 pickup; 10/24 return; contemporaneous photos.
~2019-12-08 Re-flood water intrusion (as reported): water entering G21 from above via G31 gas heater exhaust vent; caused by rainwater pooling on roof due to poor drainage exceeding vent height; described as damaging gathered items after initial flood cleanup. Gray; American Package Co. (as reported) G21 WT-116 (PDF p. TBD) → 001-PIN-116-2019REFL Primary artifact referenced: phone message to APC answering machine (to ingest/pin). v2.4.4: Date corrected from "~2019-10-25 → ~2019-10-31" per WT-116 v1.7 (FLOOD-EMAIL-078 states "December 8th").
~2019-11-19 → ~2019-11-25 B.0 (Precursor)Chris Roussis (Total Restoration, Inc.) solo visit: moisture tests & preliminary scope. Roussis; Gray G21 WT-104; WT-203 (PDF p. TBD) → 001-PIN-104-B0A; 001-PIN-203-B0 Collect: original Roussis inspection report + drawings/specs (explicit full demo of studio rooms); APC↔TR engagement records; transmittals to PA/carrier.
2019-12-03 Email to counsel memorializing ownership/non-disclosure concerns (pre-meeting). Gray; counsel WT-102 (PDF p. TBD) → 001-PIN-102-A Native .eml headers to attach.
2019-12-05 Coordination email re meetings (referenced). Gray; participants TBD WT-104 (ref.) (PDF p. TBD) → 001-PIN-104-012 Task 104-012: collect & anchor.
2019-12-11 B.1 (Meeting #1) — pre-inspection staging (different day than B.2). Evan Katz; TR representative — Chris Roussis and/or Julian Rivera (to be established); Christian Gray; Martin Kofman possible at beginning (to be established) G21 WT-104; WT-201; WT-203 (PDF p. TBD) → 001-PIN-104-B1 Staging comms/movers 12/11–12 to collect.
mid/late 2019-12 B.2 (Meeting #2)Master-adjuster walkthrough. (B.1 and B.2 occurred on different days.) Master Adjuster (TBD); Martin Kofman; Evan Katz; Chris Roussis (confirmed); Christian Gray G21 WT-104 (PDF p. TBD) → 001-PIN-104-B2 Remove Alex Morales from B.2; ID master adjuster/report/photos (104-001).
2019-12-18 Insurance declination (Great American E&S — CGL coverage; partial disclaimer). Carrier; owner; adjusters WT-103 (PDF p. TBD) → 001-PIN-103-A Endorsements & RRR to map. Property coverage via Western World (see WT-103 §C.5, WT-104 §B.3).
2020-02 (month) Property insurance claim approved (as reported). Western World Insurance Co.; owner WT-104 (B.3) (PDF p. TBD) → 001-PIN-104-B3-INS Source: WT-104 §B.3 (Feb 26, 2020 meeting). Disbursement timing unknown.
2020-02-07 ALC initial water-intrusion inspection; field by Candice A. Kowalewski; co-sign Jack Glass. ALC; Gray G21 WT-112; WT-205; WT-206 (PDF p. TBD) → 001-PIN-112-A Field notes/IR logs/license images to collect.
2020-02-26 B.3 (Meeting #3)post-claim-approval (as reported) walkthrough / mold scope. Evan Katz; Julian Rivera; Christian Gray; Alex Morales possible (to be established) G21 WT-104; WT-201; WT-202 (PDF p. TBD) → 001-PIN-104-B3 Approval disclosure (as reported); disbursement unknown; kitchen "padded the numbers" remark (as reported).
2020-03-18 ALC baseline report issued (62 sf visible mold; 750 sf water-damaged materials; PRV required). ALC (Kowalewski field; Glass co-sign) WT-112; WT-205; WT-206 (PDF p. TBD) → 001-PIN-112-RPT Insert page pins on ingest.
2020-06-15 Olmsted baseline — site inspection. Edward A. Olmsted, CIH, CSP G21 WT-107; WT-204 (PDF p. TBD) → 001-PIN-107-INSP
2020-06-28 Olmsted baseline — report issued. OES WT-107; WT-204 (PDF p. TBD) → 001-PIN-107-RPT Bates G21-OLMS-001–023 (23 pp).
2020-12-08 Court-ordered Mold Abatement Work Scope (Stipulation Exhibit 1, HP 6086/2020). 10-item scope requiring: walls to studs, floors to slab, ceilings to deck, 4 party wall probes (24"×24"), ceiling probes to wood deck, HEPA + detergent clean. Parties; court so-ordered WT-108A; WT-106A (PDF p. TBD) → 001-PIN-108A-A THE PROMISE. Baseline for scope comparison (WT-106).
2021-05-30 Water intrusion/flood from above (as reported) via upstairs heater exhaust vent; pooling on ceilings/surfaces; draining into walls/floors. Gray; owner/landlord recipients (as reported) G21 WT-116 (PDF p. TBD) → 001-PIN-116-20210530 Referenced email/photos to ingest/pin (see WT-116 collection tasks).
2021-07-20 → 2021-07-27 SERVPRO on-site remediation execution (7 days). Field instruction (as reported): "only remove one layer of drywall"; "only the bamboo layer of the flooring system"; party wall probes and ceiling probes "not mentioned." SERVPRO; Ronnie Garcia; Raheem Coleman (on-site supervisor) G21 WT-106; WT-106A; WT-207; WT-208 (PDF p. TBD) → 001-PIN-106-EXEC; 001-PIN-208-FIELD Field instruction divergence from court order. Native job file/logs/photos to collect (SUBP-SERVPRO-01). Coleman formal statement to lock (COLEMAN-LOCK-01).
2021-07-28 ALC PRV — inspection (1 day after SERVPRO work ended). 7 indoor + 1 outdoor air samples. ALC (Kowalewski; Glass) G21 WT-108; WT-106A; WT-205; WT-206 (PDF p. TBD) → 001-PIN-108-INSP RH logs/calibration sheets to map. Timing note: PRV inspection occurred 1 day after 7-day work window.
2021-08-03 ALC PRV — report issued stating G21 "achieved clearance" and was "free and clean of moisture, microbial growth, and 'mold-like' odors." Walls/ceiling/floor stated "removed as per work scope." ALC (Kowalewski; Glass signatories) WT-108; WT-106A; WT-205; WT-206 (PDF p. TBD) → 001-PIN-108-RPT THE FALSE CERTIFICATION. Verify sampling summary page.
2021-08-22 Leak event with photos/emails (as reported) showing water intrusion into G21 following rain (roof/vent pattern referenced). Parties in referenced emails (TBD) G21 WT-116 (PDF p. TBD) → 001-PIN-116-20210822 Referenced emails/photos to ingest/pin (see WT-116 collection tasks).
2021-09-02 Flood from ceiling into G21 (as reported) with water impacting multiple walls (north party wall; east living/studio wall; bathroom/south living wall). Parties in referenced email (TBD) G21 WT-116 (PDF p. TBD) → 001-PIN-116-20210902 Referenced email + photos to ingest/pin (see WT-116 collection tasks).
2021-08-03 → 2022-11-30 (date TBD) HP 6086/2020 — conference noted where landlord's counsel stated completion affidavits were "inaccurate." Court; Skaller; parties NYC Civil Ct., Kings HP External (HP 6086/2020); WT-106 §C P1 CRITICAL001-PIN-HP6086-TR THE ADMISSION. Certified transcript + appearance sheet to collect (HP-TRANS-01).
2022-08-18 Olmsted on-site inspection & response to ALC. Key findings: Studio 1 floor NOT removed to slab (two layers wood left; damp/wet underside with visible mold); bathroom raised floor NOT removed; bathroom/kitchen shared wall NOT opened (visible mold remained); party wall probes NOT cut; ceiling probes NOT cut. Materials could be lifted/slid by hand to reveal hidden mold. Olmsted stated PRV was "replete with misleading and incorrect statements." Edward A. Olmsted, CIH, CSP G21 WT-109; WT-106A; WT-204 (PDF p. TBD) → 001-PIN-109-A THE PROFESSIONAL AUDIT. Olmsted photos/moisture data to collect (109-EVID-01).
2022-08-29 Leak event with photos (as reported) documenting additional water intrusion affecting G21 after rain events. Parties in referenced photos/emails (TBD) G21 WT-116 (PDF p. TBD) → 001-PIN-116-20220829 Referenced photos/emails to ingest/pin (see WT-116 collection tasks).
2022-11-07 Olmsted follow-up scope identifying additional work required. OES WT-110; WT-106A (PDF p. TBD) → 001-PIN-110-A Cross-align with 110A.
2022-11 (day TBD) ALC "Additional Scope of Work" (proposed by same firm that issued "achieved clearance" PRV). ALC WT-110A (PDF p. TBD) → 001-PIN-110A-A OCR/signatory/recipient to complete. Self-impeachment: ALC proposed additional scope after certifying "complete."
2023-07-12 Rainstorm re-flood discovery — tenant discovers standing water in G21 from prior rainstorm (NYC-area storm July 9-10, 2023; State of Emergency declared); sends "G21 Flooded Again!" email with photos. Photos show pools of standing water on concrete floors throughout living area, hallway, and kitchen; water damage at wall-floor junctions. Tenant email states water likely entered through (a) bathroom pipes left uncapped and (b) ceiling leak. Gray; APC (as property owner) G21 WT-116 (PDF p. TBD) → 001-PIN-116-RAINSTORM WT-116 B.4.1. Photos in WT-111; storm corroborated via NWS/NY State records.
2023-07-13 SERVPRO valve break incident — bathroom sink supply/shutoff failure: flexible sink feed line routed into an open wall drain opening; water discharged at full pressure (captured on video). Tenant-captured video + 12 native iPhone stills document the incident. SERVPRO crew; Gray G21 bathroom WT-106A (Vid/storyboard p. TBD) → 001-PIN-106A-VID WT-116 B.4.2. Scope limited to valve break; rainstorm flooding documented separately in B.4.1.
2023-07-12 → 2023-07-17 Visible mold documentation — email thread and photo sets document visible mold in G21 in areas certified as "cleared" after ALC PRV (dated 2021-08-03). Plumber attendance and shut-off/capping actions documented in thread (Jul 14 & 17). Gray; recipients in threads G21 WT-116; WT-111 (PDF p. TBD) → 001-PIN-116-2023JULY-MOLD WT-116 B.4.3. Consequence evidence: mold in "cleared" areas post-PRV. Underlying packet: WT-111. Native photos (EXIF) logged (116-META-01).

Dating notes: Month-only items remain "~" or "mid/late" until native artifacts (email headers, logs, calendar invites, job records) are pinned.


PART B.1 — Scope Manipulation Evidence Arc Summary (facts-only)

This section summarizes the six-phase evidence arc documented in WT-114 (Scope Manipulation Evidence Compendium):

Phase Date Event Source Key Fact
THE PROMISE 2020-12-08 Court-ordered 10-item scope WT-108A Walls to studs; floors to slab; 4 party wall probes; ceiling probes
THE BETRAYAL 2021-07-20 → 07-27 Field instruction diverged WT-208 §C.1 "One layer drywall only"; "bamboo only"; probes "not mentioned"
THE FALSE CERTIFICATION 2021-08-03 ALC PRV "achieved clearance" WT-108 Certified work "removed as per scope"
THE PROFESSIONAL AUDIT 2022-08-18 Olmsted on-site inspection WT-109 Scope items incomplete; visible mold; materials liftable by hand
THE ADMISSION 2022 (TBD) Counsel "not accurate" statement HP 6086/2020 Affidavits acknowledged as inaccurate
THE CONSEQUENCE 2023-07-12 → 07-17 Re-flood; visible mold documented WT-116 B.4.3 Mold in areas certified "cleared" post-PRV (PRV dated 2021-08-03)

v2.4 Note: THE CONSEQUENCE phase references WT-116 B.4.3 (visible mold documentation window). July 2023 events separated per WT-116 v1.2 corrected chronology: B.4.1 rainstorm discovery (07-12), B.4.2 valve break (07-13), B.4.3 mold window (07-12 to 07-17).

Master Reference: WT-114 consolidates all evidence with item-by-item comparison tables, source divergences matrix, and collection task priorities.


PART C — Open Mechanical Tasks (pinpoints & Bates)

  • 001-PIN-104-TRIG / -B0A / -B1 / -B2 / -B3 / -B3-INS — Insert WT-104 page pins (trigger, meetings, insurance approval).
  • 001-PIN-102-A — Insert WT-102 page pin (2019-12-03 email).
  • 001-PIN-103-A — Insert WT-103 declination page pin.
  • 001-PIN-113-BANK / -EXIF / -2FT — Insert WT-113 pins (Home Depot lines; in-unit EXIFs; hallway cut images).
  • 001-PIN-112-A / 001-PIN-112-RPT — Insert WT-112 initial inspection + baseline report pins.
  • 001-PIN-107-INSP / 001-PIN-107-RPT — Insert WT-107 inspection/report pins (Bates G21-OLMS-001–023).
  • 001-PIN-108A-A — Insert WT-108A scope pin.
  • 001-PIN-106-EXEC / 001-PIN-208-FIELD / 001-PIN-106A-VID — Insert WT-106 / WT-208 / WT-106A execution/field instruction/video pins.
  • 001-PIN-108-INSP / 001-PIN-108-RPT — Insert WT-108 PRV pins.
  • 001-PIN-109-A / 001-PIN-110-A / 001-PIN-110A-A — Insert WT-109 / WT-110 / WT-110A pins.
  • 001-PIN-116-2019REFL / 001-PIN-116-20210530 / 001-PIN-116-20210822 / 001-PIN-116-20210902 / 001-PIN-116-20220829 — Insert WT-116 pins (pre-2023 chronology annex).
  • 001-PIN-116-RAINSTORM — Insert WT-116 pin for July 2023 rainstorm re-flood discovery (B.4.1).
  • 001-PIN-116-2023JULY-MOLD — Insert WT-116 pin for July 2023 visible mold documentation (B.4.3).
  • 001-PIN-HP6086-TR — Insert HP 6086/2020 transcript date/Part/page/line once certified transcript + appearance sheet are received (P1 CRITICAL).

Scope Manipulation Collection Tasks (from WT-114 §K):

Task ID Target Purpose Status
COLEMAN-LOCK-01 Coleman formal statement Lock "one layer / bamboo only" testimony Pending
SUBP-SERVPRO-01 SERVPRO work orders/logs (Jul 20-27, 2021) Documentary proof of scope instructions Pending
HP-TRANS-01 HP 6086/2020 certified transcript Page/line for "not accurate" admission Pending
109-EVID-01 Olmsted photos/moisture data (Aug 2022) Physical evidence of non-completion Pending
116-META-01 Native photos with EXIF (Jul 2023) Authenticate re-flood documentation Pending

Bates mapping: Apply per-tab ranges as productions occur (see WT-003 â–¸ Entries for WT-10x/11x/20x/30x).


PART D — Cross-References (White tabs)

Framework DocumentsWT-004 — Evidence Chain Framework (aligned) and WT-003 ▸ Entry — WT-104 Discovery Packet (B.0–B.3 tasks & routing).

Core Meeting FrameworkWT-104 (B.0–B.3 locked), WT-102 (2019-12-03 counsel email), WT-103 (2019-12-18 declination).

Scope Manipulation Evidence ArcWT-114 (Master Evidence Compendium), WT-106 (Executed vs. Ordered comparison matrix), WT-108A (Dec 8, 2020 court-ordered scope), WT-108 (ALC PRV "achieved clearance"), WT-109 (Olmsted Aug 2022 audit), WT-208 (Coleman field instructions).

SERVPRO Execution SetWT-106 (Executed vs. Ordered), WT-106A (valve break video — 2023-07-13; scope limited to valve break), WT-207 (Garcia), WT-208 (Coleman).

Environmental Sequence (Chain G)WT-112, WT-107, WT-108, WT-108A, WT-109, WT-110, WT-110A; External: HP 6086/2020 transcript (P1 CRITICAL).

Re-Flood / Leaks ChronologyWT-116 (leaks/flood chronology + July 2023 three-event breakdown: B.4.1 rainstorm discovery, B.4.2 valve break, B.4.3 visible mold); WT-111 (underlying July 2023 email/photo packet); WT-106A (valve break video).

WitnessesWT-201 (Katz), WT-202 (Rivera), WT-203 (Roussis), WT-204 (Olmsted), WT-205 (Kowalewski), WT-206 (Glass), WT-207 (Garcia), WT-208 (Coleman).

CorporateWT-301 (Total Restoration, Inc.), WT-302 (Power Adjustment), WT-303 (ALC Environmental).


PART E — Verification Status (per event)

  • B.1 vs B.2: Explicit different-day sequencing affirmed; adjuster walk-through is mid/late Dec 2019, not Dec 11.
  • Participants: Alex Morales removed from B.2; possible at B.3 only (to be established). TR representative at B.1 is recorded as Roussis and/or Rivera (to be established).
  • B.3 phrasing: "Post-claim-approval (as reported)" replaces prior "post-payment"; disbursement timing unknown (to be determined via discovery).
  • Naming canon: Total Restoration, Inc. used consistently.
  • Chain G: Environmental sequence remains fully threaded.
  • Scope Manipulation Arc: Six-phase evidence sequence (Promise → Betrayal → False Certification → Professional Audit → Admission → Consequence) documented with source citations per WT-114.
  • Property insurance source: Feb 2020 approval documented via WT-104 (B.3), not WT-103 (which covers CGL declination only).
  • July 2023 event separation (v2.4 corrected chronology): Three distinct events now documented in chronological order per WT-116 v1.2:
  • B.4.1: Rainstorm re-flood discovery (2023-07-12) — uncapped pipes + ceiling leak → WT-116
  • B.4.2: SERVPRO valve break (2023-07-13) — SERVPRO field incident → WT-106A
  • B.4.3: Visible mold documentation window (2023-07-12 to 07-17) — consequence evidence → WT-116/WT-111

END — White Tab 001 — Master Timeline (Facts-Only) v2.4.4