Skip to content

White Tab 003 ▸ Entry — WT‑109 Discovery Packet — Olmsted Response Collection

GUARDRAIL: WHITE — FACT REPOSITORY ONLY

Facts & source pinpoints only. No strategy, no argument, no legal opinions. All quotations are "as reported" unless exact text appears in a cited source.

A. Source Tab Summary

Related Source Tab: WT‑109 — Olmsted Response to ALC (Aug 18, 2022) — Tier‑1 Expert Response (4 pp.; Bates G21‑OLMSTED‑001–004).

What WT‑109 Contains (facts‑only):

A four‑page expert response letter from Edward A. Olmsted, CIH, CSP to tenant counsel (Margaret Sandercock, Esq.) addressing an affirmation by landlord's counsel, David Skaller and statements attributed to ALC's Candice A. Kowalewski, MPH and Jack Glass, MS, CIH. Olmsted states the affirmation contains "misleading and incorrect statements," then details non‑completed scope items and post‑remediation observations including: Studio 1 floor not removed to slab (two wood layers left; damp underside; visible mold); sheetrock left above insulation with visible mold; and shared wall contamination. He also notes required living room probes (four 2′×2′ party‑wall probes and ceiling probes to deck) were not cut, describes a July 2021 meeting where Glass acknowledged further work was needed (plan expected but "never provided"), cites EPA/AIHA guidance on hidden mold (and research by Pessi et al., 2002), and states Local Law 61 filings were not made.

Context vs. PRV (WT‑108):

ALC's PRV (Aug 3, 2021) states "This apartment has achieved clearance" and reports indoor RH around 73%, while claiming materials measured dry. Olmsted's 2022 response states multiple items remained wet/contaminated and scope was "never followed."

Why This Matters:

WT‑109 is the first professional rebuttal to ALC's clearance certification, identifying specific scope failures (e.g., Studio 1 floor not to slab; probes not cut) and documenting professional‑standards bases (EPA/AIHA; LL61) for further work. It is the bridge document linking PRV claims to later findings (WT‑110 visible mold; WT‑111 re‑wet).

Known Gaps Called Out in WT‑109:

The WT‑109 source itself flags needed items: Skaller affirmation (full text), Kowalewski/Glass affidavits, Bard decision pages 19/26, July 2021 meeting notes, Olmsted post‑remediation photos & moisture data, and LL61 filing records.


B. Priority Classification

Priority Count Timeline Categories
P1 — Critical 7 30 days Skaller affirmation & ALC affidavits; field evidence underlying WT‑109; LL61 filings; July 2021 meeting records; native WT‑109
P2 — High 7 60 days PRV correlation & pinpoints; SERVPRO execution records; Dec 8, 2020 scope; ALC responses; standards packet; communications
P3 — Medium 5 90 days Witness outreach; construction verification; sample/photo mapping; PRV air‑site mapping; WT‑120 divergences entries
TOTAL 19 90 days Comprehensive authentication of Olmsted's response & its assertions

Completion Status: 0/19 items obtained (0% complete)


C. Detailed Task Breakdown

Tier 1 — Core Evidence & Compliance (P1 — Critical, 30 Days)

Task ID Description What to Obtain From Whom Rationale Status Owner Due Notes
WT109‑001 Skaller Affirmation — certified copy Full affirmation referenced in WT‑109; file‑stamp, date, court, case number Landlord's counsel / court file WT‑109 directly responds to this document; needed to match each challenged statement. Outstanding Legal 2025‑11‑27 Capture exact quotes Olmsted identifies as incorrect/misleading.
WT109‑002 ALC Affidavits (Kowalewski, Glass) All sworn statements asserting completion/clearance relied upon in affirmation Court file / ALC / landlord Identifies which sworn statements WT‑109 challenges; supports impeachment/credibility analysis. Outstanding Legal 2025‑11‑27 Pull certified copies w/ seals; note signature/credential lines.
WT109‑003 Olmsted post‑remediation field evidence Original photos and moisture‑reading logs supporting Studio 1 floor and wall findings Edward A. Olmsted WT‑109 states two wood layers left, damp underside, visible mold; need originals + EXIF and instrument logs. Outstanding Legal/Forensics 2025‑11‑27 Request native images w/ EXIF; document meter model/mode used.
WT109‑004 LL61 filing records (or non‑filing proof) NYC DOB LL61: work plan notice, work plan, post‑remediation assessment & certification NYC DOB / ALC WT‑109 states these were not filed; verify via DOB records or ALC production. Outstanding Paralegal 2025‑11‑27 If no filings exist, obtain DOB certification of no record.
WT109‑005 July 2021 Olmsted↔Glass meeting records Calendars, emails, notes; any "further work" plan Glass was to send ALC / Olmsted WT‑109 says Glass acknowledged more work was needed; plan "never provided." Outstanding Legal 2025‑11‑27 Pin participants/date; obtain any draft plan.
WT109‑006 WT‑109 native PDF + transmittal Native PDF (not scan) with properties + cover email/letter sending to counsel Olmsted / Tenant Counsel Authenticates authorship/dates and delivery chain; page‑level accuracy. Outstanding Paralegal 2025‑11‑27 Extract metadata: creation/mod times, author, software.
WT109‑007 Bard v. Mautner‑Glick decision pages Decision pages 19 & 26 (and others as needed) Court database WT‑109 cites Bard to rebut "he cut the ceiling" claim; need exact text. Outstanding Legal 2025‑11‑27 Pull full decision + any references to probe cutting.

Tier 2 — Corroboration & Surround (P2 — High, 60 Days)

Task ID Description What to Obtain From Whom Rationale Status Owner Due Notes
WT109‑008 PRV correlation & pinpoints Precise PRV language for "achieved clearance," dryness, RH ~73%, sample count/locations ALC PRV (WT‑108) Side‑by‑side with WT‑109 assertions for WT‑120. Outstanding Paralegal 2025‑12‑27 Use WT‑108 native PDF (if available) for page cites.
WT109‑009 SERVPRO execution documentation Work orders, dailies, photos for July 20–27, 2021 SERVPRO / Landlord Corroborates WT‑109 claim that scope "was never followed." Outstanding Legal 2025‑12‑27 Coordinate with WT‑106‑002/003 to avoid duplication.
WT109‑010 Dec 8, 2020 Stipulation Scope (certified) Exhibit 1, full certified copy Housing Court Baseline to show what probes/demolition were required (e.g., probes 8–9). Outstanding Legal 2025‑12‑27 Target pp. where probes described.
WT109‑011 ALC Nov 2022 Additional Scope Kitchen floor "complete removal" page ALC / Landlord Shows later acknowledgment of incomplete work post‑PRV. Outstanding Legal 2025‑12‑27 Cross‑file with WT‑106/WT‑111.
WT109‑012 ALC response to WT‑109 Any letters/emails disputing or adopting WT‑109 ALC / Landlord Determines whether ALC contested or conceded items. Outstanding Legal 2025‑12‑27 Look for revisions, addenda, or meeting notes.
WT109‑013 Standards packet (as‑of 2022) EPA hidden mold guidance; AIHA 2019; Pessi 2002 article Publishers / Libraries Documents the exact passages WT‑109 relies on. Outstanding Paralegal 2025‑12‑27 Print key pages; tab and highlight cited text.
WT109‑014 ALC/Skaller comms about PRV Emails/memos discussing clearance and scope completion ALC / Landlord counsel Context for affidavit statements WT‑109 challenges. Outstanding Legal 2025‑12‑27 Request date range Dec 2020–Aug 2022.

Tier 3 — Mapping, Witness, & Indexing (P3 — Medium, 90 Days)

Task ID Description What to Obtain From Whom Status / Owner / Due Notes
WT109‑015 Glass witness outreach Interview availability; statement on "further work needed" Jack Glass / ALC Outstanding • Investigator • 2026‑01‑26 Preserve neutrality; facts‑only memo.
WT109‑016 Studio 1 construction verification Drawings/permits or photos confirming two‑layer wood floor assembly Landlord / DOB Outstanding • Paralegal • 2026‑01‑26 Confirms WT‑109 description.
WT109‑017 Photo‑to‑room map Index linking each Aug 2022 photo to room/probe items Olmsted / Paralegal Outstanding • Paralegal • 2026‑01‑26 Supports exhibit creation.
WT109‑018 PRV air‑site mapping Map ALC air sample locations vs. Studio 1/hidden zones ALC PRV / ALC tech notes Outstanding • Paralegal • 2026‑01‑26 Tests adequacy re hidden growth.
WT109‑019 WT‑120 lines (WT‑109) Draft neutral divergences entries for WT‑120 Internal Outstanding • Paralegal • 2026‑01‑26 Use table language mirrored from WT‑109.

D. Authentication Requirements

Document Standards:

  • Originals / Certified: Skaller affirmation, ALC affidavits, Stipulation Exhibit 1 — certified court copies.
  • Native Files: WT‑109 native PDF with properties; Olmsted photos (originals with EXIF); meter logs.
  • Laboratory/Instrument: If any sampling logs are referenced, obtain chain of custody; for moisture meters, capture model/mode used (pin vs. non‑invasive) and calibration policy.
  • LL61: Certified DOB records or official "no record" confirmation.

Metadata Preservation:

  • Photos: retain EXIF (capture time, device); PDFs: author/creation timestamps; Emails: full headers.
  • Maintain hashes on receipt for digital items.

Chain of Custody:

  • Record source, date, handler for each acquisition; separate originals vs. working copies; Bates on produced copies only; log in WT‑003 master.

Bates Stamping Protocol:

  • G21‑OLMSTED‑001–004 reserved for the WT‑109 letter (already assigned).
  • G21‑OLMSTED‑SUPP‑IMG‑### (Olmsted photos)
  • G21‑OLMSTED‑SUPP‑MTR‑### (moisture logs)
  • G21‑OLMSTED‑SUPP‑STD‑### (standards excerpts)
  • G21‑OLMSTED‑SUPP‑LL61‑### (DOB records)

E. Cross‑References

Related White Tabs (facts‑only):

  • WT‑107 — Olmsted Baseline (June 28, 2020): establishes pre‑work contamination and "full gut" standard.
  • WT‑108 — ALC PRV (Aug 3, 2021): "achieved clearance," indoor RH ~73%, 7 indoor + 1 outdoor sample.
  • WT‑108A — Work Scope Plan (Dec 8, 2020): required gut/probes used as comparison baseline.
  • WT‑110 — Olmsted Follow‑Up (Nov 7, 2022): additional scope/visible mold (post‑PRV).
  • WT‑111 — July 2023 re‑wet: black mold and water intrusion (24 months post‑PRV).
  • WT‑106 — Court‑Ordered vs. Executed: matrix of scope vs. execution; WT‑109 supplies "non‑completed" column lines.

Witnesses & Entities:

  • Edward A. Olmsted, CIH, CSP (author); Candice A. Kowalewski, MPH; Jack Glass, MS, CIH; David Skaller, Esq.; Margaret Sandercock, Esq. (recipient).

F. Status Tracking

Outstanding Items (by Priority):

  • P1 (7 items): WT109‑001 … WT109‑007 — Critical document set (affirmation, affidavits, field photos/logs, LL61, July 2021 records, native WT‑109, Bard pages).
  • P2 (7 items): WT109‑008 … WT109‑014 — PRV pinpoints, SERVPRO records, Dec 8 scope, ALC responses, standards packet, communications.
  • P3 (5 items): WT109‑015 … WT109‑019 — Witness outreach, verifications, mappings, WT‑120 entries.

Received: 0 / 19 | Outstanding: 19 / 19 | Completion: 0%

Verification Checklist (apply on receipt):

  • [ ] Certified/Original? • Complete pagination/attachments? • Metadata intact? • Chain of custody logged? • Bates assigned & filed? • WT‑001 timeline updated with dated facts? • WT‑120 entries refreshed?

END — White Tab 003 ▸ Entry — WT‑109 Discovery Packet — Olmsted Response Collection v1.2