A) Source Tab Summary¶
Related Source Tab: WT‑111 — July 2023 Re‑Flood Email Packet (Tier‑1 Evidence v1.1, archived)
What WT‑111 contains (facts‑only):
- A complete July 12–17, 2023 email thread reporting a new water event in G21, with contemporaneous descriptions of standing water and visible black mold and multiple PDF photo sets.
- The emails identify two water sources: (1) ceiling/roof leakage described as a chronic, building‑wide issue; and (2) a bathroom plumbing failure linked to a broken shut‑off valve and an improper drain feed, causing leakage at the wall/floor.
- Landlord actions logged in the thread: plumber visit July 14, and water shut‑off / pipe capping July 17; emails state the issue was plumbing and also reference multiple tenants' roof‑leak complaints.
- The packet comprises 6 PDFs / 37 pages with Bates G21‑EVID‑111‑001–111‑037; filenames and Bates spans are listed in‑file.
Why it matters (facts that drive collection):
- The event occurred ~24 months after the July 28, 2021 PRV that certified "achieved clearance," and it documents fresh moisture and visible mold in areas previously highlighted as high‑risk in June 2020 (kitchen floor; bathroom/raised floor; living area).
- The email/photo evidence is already archived; discovery now focuses on native originals, third‑party corroboration (plumber), and building‑wide roof records to complete the evidentiary chain.
B) Priority Classification¶
| Priority | Count | Timeline | Categories |
|---|---|---|---|
| P2 — High | 10 | 60 days | Native digital evidence; plumber documentation; roof‑pattern corroboration |
| P3 — Medium | 1 | 90 days | ALC Nov 2022 "Additional Scope" pinpoint/authentication |
| TOTAL | 11 | — | Base WT‑111 email/photo packet is already archived; these tasks enhance authentication and corroboration. |
(Rationale for P2/P3): WT‑111 v1.1 is complete; native files and third‑party records elevate admissibility and help align with prior scope/baseline tabs.
C) Detailed Task Breakdown¶
Category 1 — Native Digital Evidence (HIGH — P2)¶
| Task ID | Description | What to Obtain | From Whom/Where | Rationale | Status / Owner / Due | Notes |
|---|---|---|---|---|---|---|
| WT111‑P2‑001 | Native photo originals | All original image files from July 12–17, 2023 with EXIF (datetime, device, GPS if any); file hashes | Christian Gray / device or cloud | PDFs are prints; native images enable forensic dating & higher‑res review. | Outstanding • IT/Forensics • 2025‑12‑27 | WT‑111 shows multiple photo PDFs (inline and attachments). |
| WT111‑P2‑002 | Video files (if any) | Native video(s) referenced in email chain; metadata & audio | Christian Gray | Motion evidence + on‑scene narration (if any); preserve creation data. | Outstanding • IT/Forensics • 2025‑12‑27 | Video is mentioned as a potential; confirm existence. |
| WT111‑P2‑003 | Native emails with full headers | Original .eml/.mbox of all messages + native attachments | Yahoo Mail export / user mailbox | Server routing & timestamps for authentication; chain‑of‑custody. | Outstanding • Paralegal • 2025‑12‑27 | Current archive = PDF prints; headers needed. |
Category 2 — Plumber Documentation (HIGH — P2)¶
| Task ID | Description | What to Obtain | From Whom/Where | Rationale | Status / Owner / Due | Notes |
|---|---|---|---|---|---|---|
| WT111‑P2‑004 | Work order — July 14 visit | Service ticket; problem description; crew; time on site | Plumbing company (via landlord) | Email states plumber visited & decided on shut‑off. | Outstanding • Legal • 2025‑12‑27 | Corroborates July 14 entry. |
| WT111‑P2‑005 | Invoice / completion — July 17 | Itemized invoice; materials; completion cert; any tests | Plumbing company / AP records | Emails state pipes "cap[p]ed" on July 17 and issue confirmed plumbing. | Outstanding • Legal • 2025‑12‑27 | Verifies date & scope of fix. |
| WT111‑P2‑006 | Plumber findings memo/photos | Any written findings; photos; cause description | Plumber crew chief / files | Independent causation account (broken valve; drain feed). | Outstanding • Legal • 2025‑12‑27 | Aligns with July 13 plumbing description email. |
Category 3 — Building‑Wide Roof‑Leak Pattern (HIGH — P2)¶
| Task ID | Description | What to Obtain | From Whom/Where | Rationale | Status / Owner / Due | Notes |
|---|---|---|---|---|---|---|
| WT111‑P2‑007 | Roof maintenance history | Work orders, service calls, vendor reports 2019–present | Property mgmt; roofing vendors | Emails cite chronic, multi‑tenant roof leaks. | Outstanding • Legal • 2025‑12‑27 | Establish landlord knowledge/pattern. |
| WT111‑P2‑008 | Other tenant complaints | HPD/311 logs; tenant statements | HPD; tenants; mgmt log | Corroborates building‑wide nature. | Outstanding • Investigator • 2025‑12‑27 | Link dates to storms & G21 events. |
| WT111‑P2‑009 | Roofing assessments/bids | Contractor evaluations; scope; photos | Roofing vendors | Independent expert documentation of roof condition. | Outstanding • Legal • 2025‑12‑27 | Compare to leak chronology. |
| WT111‑P2‑010 | Mgmt communications | Emails/texts acknowledging roof issues | Property mgmt | Knowledge, remedial plans, delays. | Outstanding • Legal • 2025‑12‑27 | Date‑match to July 2023 emails. |
Category 4 — ALC "Additional Scope" (Nov 2022) (MED — P3)¶
| Task ID | Description | What to Obtain | From Whom/Where | Rationale | Status / Owner / Due | Notes |
|---|---|---|---|---|---|---|
| WT111‑P3‑001 | ALC Nov 2022 doc — pinpoint | Native PDF; page pinpoint for kitchen floor language; metadata | ALC / landlord / counsel | WT‑111 file notes doc present; authenticate and capture exact text. | Outstanding • Paralegal • 2026‑01‑26 | WT‑106 also tracks this item; collect once, file to both. |
D) Authentication Requirements¶
- Originals / Certified: Prefer native files (emails, photos, video); if unavailable, obtain certified copies/document custodian statements.
- Metadata: Preserve EXIF for photos/video; retain full email headers and attachment metadata.
- Chain of Custody: Record source, transfer method, hash values, and any processing steps for digital evidence.
- Bates Protocol: WT‑111 base is G21‑EVID‑111‑001–111‑037. New materials file as G21‑EVID‑111‑038+ with sub‑series tags: PHOTO‑NAT, EMAIL‑NAT, PLUMB‑DOC, ROOF‑MAINT, ALC‑ADD‑SCOPE.
E) Cross‑References (White only)¶
- WT‑107 — Olmsted Baseline (Jun 28, 2020): kitchen floor 190,000 CFU/in²; bathroom wall/raised floor findings; multi‑layer assemblies that trap water. (Use WT‑107 tab for details.)
- WT‑108 — ALC PRV (Aug 3, 2021): PRV claims "achieved clearance"; Appendix B Work Scope (Dec 8, 2020) includes gut to slab for Rooms 1–3.
- WT‑106 — Scope: Court‑Ordered vs Executed: add neutral note that July 2023 re‑wet and visible mold were documented in bath/hall/living areas post‑PRV; WT‑106 already links overlapping tasks for plumber and roof records.
F) Status Tracking¶
Archive status: WT‑111 v1.1 (6 PDFs / 37 pages) complete and Bates‑stamped; discovery focuses on native originals & corroboration.
Outstanding items: 11 / 11 (0% collected)
Overlap with WT‑106: 6 of 11 items (collect once, file to both), including native photos/video, plumber work order (7/14), plumber invoice (7/17), roof maintenance, other tenant complaints, ALC Nov 2022 additional scope.
Verification checklist (apply on receipt)¶
- [ ] Complete (all pages/attachments present)
- [ ] Authentic (source verified; originals or certified)
- [ ] Metadata preserved (EXIF, headers, file props)
- [ ] Readable (legible resolution)
- [ ] Bates assigned and logged
- [ ] Filed to correct White tab(s)
- [ ] WT‑001 updated with any new dated facts
G) Source Files & Bates Index (from WT‑111)¶
| # | File (uploaded name) | Pages | Bates start–end | Contents summary |
|---|---|---|---|---|
| 1 | July 2023 Flood Email 1.pdf | 2 | 111‑001–111‑002 | Jul 12 "G21 Flooded Again" notice; standing water described. |
| 2 | July 2023 Flood Email 2.pdf | 2 | 111‑003–111‑004 | Access coordination; door frame misaligned. |
| 3 | July 2023 Flood Email 3.pdf | 6 | 111‑005–111‑010 | Plumber 7/14; plan to shut off; 7/17 capping; roof issue noted. |
| 4 | Yahoo Mail – Pics 1–4 … | 6 | 111‑011–111‑016 | First photo set (standing water; wall impacts). |
| 5 | Yahoo Mail – Inline Pics … | 15 | 111‑017–111‑031 | Inline photos (pooling; mold on studs/finishes). |
| 6 | Yahoo Mail – Pics 9–12 … | 6 | 111‑032–111‑037 | Final photo set (pooling/damage). |
Email chronology pinpoints (from WT‑111):
7/12: "flooded again," standing water at bath/hall & east LR wall → photos sent • 7/13: access; broken shut‑off & improper drain feed; visible black mold; likely pooling under kitchen floor • 7/14: plumber visited; plan to shut off all water • 7/17: plumbers "cap[p]ed the pipes"; building‑wide roof leaks noted as chronic.