Skip to content

White Tab 003 ▸ Entry — WT-303 Discovery Packet (ALC Environmental)

GUARDRAIL: WHITE — FACT REPOSITORY ONLY

Facts & source pinpoints only. No strategy, no argument, no legal opinions. All quotations are "as reported" unless exact text appears in a cited source.

A) Source Context & Scope (facts-only)

  • Parent tracker: WT-003 — Document Collection / Discovery Tracker (icon Gear).
  • This nested page covers: WT-303 — ALC Environmental — Corporate Profile.
  • Purpose: Translate WT-303's PRV certification, corporate identity, and field documentation needs into concrete discovery tasks, deadlines, and status tracking.

Icon discipline: all WT-003 entries use Gear; the parent WT-303 corporate profile uses User 3.


B) Engagement Background (facts-only summary)

  • Entity in record: "ALC Environmental" (exact legal name TBD from native PRV letterhead/W-9/COI/contract).
  • Name variants (public pointers): "ALC Environmental Inc." (BBB); "The ALC Group LLC d/b/a ALC Environmental" (court records).
  • Public address pointers:
  • 158 West 27th St., 8th Floor, New York, NY 10001 (current website)
  • 225 West 34th St., Suite 1600, New York, NY 10122 (BBB listing)
  • 121 West 27th St., Suite 402, New York, NY 10001 (historical directory)
  • Key personnel:
  • Jack Glass, MS, CIH — Co-signatory on PRV; VP Environmental Health Services (per 2018 article)
  • Candice A. Kowalewski, MPH — Field professional on PRV; email sender (WT-112A)
  • Engagement period: 2020–2022 (Pre-remediation through PRV and Additional Scope).
  • Property: 226 Franklin St., Apt. G21 (entrance 97 Green St.), Brooklyn, NY 11222.

Key ALC Documents in White:

Tab Document Date Key Facts
WT-108 Post-Remediation Verification (PRV) Insp. 2021-07-28; Report 2021-08-03 "Achieved clearance" statement; 7 indoor + 1 outdoor samples
WT-108A Mold Abatement Work Scope 2020-12-08 Court-ordered 10-item scope (Stipulation Exhibit 1)
WT-110A "Additional Scope of Work" Nov 2022 Proposed additional scope items
WT-112 Pre-Remediation Inspection Feb-Mar 2020 Pre-award communications
WT-112A "Re: Appointment and Mold Report" 2020 Email from Kowalewski

C) Possession Status (facts)

Record Type Custodian Possession Status Notes
PRV Report (native PDF) ALC Environmental Tenant has copy; native needed Verify signatures, sampling data
Field Data Sheets ALC Environmental Tenant does not possess Critical for PRV authentication
Chain-of-Custody (lab) ALC Environmental / Lab Tenant does not possess Sample integrity documentation
Calibration Logs ALC Environmental Tenant does not possess Equipment validation
Lab Reports ALC Environmental / Lab Tenant does not possess Spore trap analysis
W-9 ALC Environmental / Landlord Tenant does not possess Legal entity identity
COI (GL/PL/E&O) ALC Environmental / Landlord Tenant does not possess Coverage verification
Contract/SOW ALC Environmental / Landlord Tenant does not possess Engagement scope

D) Custodian Map (who holds what)

Custodian Likely Records Held Discovery Vehicle Priority
ALC Environmental PRV package (report, field sheets, COC, lab results, calibration), W-9, COI, invoices, all G21 correspondence, Additional Scope docs SUBP-303-ALC-01 P1 (30d)
American Package Co. / Martin Kofman (landlord) Landlord's copies of ALC deliverables, W-9/COI, payment records, correspondence RFP-303-LANDLORD-01 P1 (30d)
Laboratory (TBD) Original lab analysis reports; sample COC; analytical methods SUBP-303-LAB-01 P2 (60d)
SERVPRO / Remediation Contractor Any ALC coordination for PRV timing; clearance requirements RFP-303-SERVPRO-01 P2 (60d)
NY Department of State Entity print for legal name on engagement REQ-303-DOS-01 P3 (90d)
NYSDOL Mold Program Mold assessor license status (if applicable) REQ-303-NYSDOL-01 P3 (90d)
Professional Certifications (AIHA/ABIH) CIH certification status for Glass REQ-303-CERT-01 P3 (90d)

E) Priority 1 — Critical Discovery (Target: 30 days)

1) ALC Environmental Records — SUBP-303-ALC-01

Requested items (175+ document specifications):

PRV Package — Critical (50 items): - Native PDF of PRV report (WT-108) - Field data sheets from 2021-07-28 inspection - Chain-of-custody forms for all samples - Calibration logs for sampling equipment (spore traps, air pumps) - Laboratory reports for all samples (7 indoor + 1 outdoor per White) - Photos taken during PRV inspection (native with EXIF) - Any notes or observations recorded on-site - Quality assurance/quality control (QA/QC) documentation - Background/outdoor sample rationale and location - Clearance criteria applied and basis

Engagement & Authority (20 items): - Contract/SOW/Authorization for G21 work (2020-2022) - W-9 (legal name/EIN) - Certificate of Insurance (GL/PL/E&O policy numbers; effective dates; named insured) - Any amendments or change orders - Invoices and payment records

Pre-Remediation Materials (25 items): - Pre-remediation inspection report (WT-112 source) - Photos from pre-remediation inspection (native with EXIF) - Recommendations provided to landlord/contractor - Any scope documents prepared by ALC - Email correspondence with landlord (Feb-Mar 2020)

Additional Scope Materials (20 items): - "Additional Scope of Work" (Nov 2022) native PDF (WT-110A source) - Transmittal emails/cover letters - Any supporting inspection data - Recommendations and basis

Communications — Full Set (40 items): - All emails between ALC and landlord (2020-2022) - All emails between ALC and contractors (SERVPRO, Total Restoration) - All emails between ALC and Power Adjustment - Any communications with tenant (Christian Gray) - Internal ALC communications re G21

Personnel Records (20 items): - HR/employment records for Jack Glass, MS, CIH (2020-2022) - HR/employment records for Candice A. Kowalewski, MPH (2020-2022) - Title/role assignments for G21 project - Signature authority documentation - Professional certifications on file (CIH, MPH, etc.)

2) Landlord Records — RFP-303-LANDLORD-01

  • Landlord's copy of ALC contract/SOW
  • W-9 and COI received from ALC
  • Payment records to ALC
  • Correspondence with ALC (2020-2022)
  • Any complaints or issues documented
  • Instructions provided to ALC re scope

F) Priority 2 — High-Value Discovery (Target: 60 days)

3) Laboratory Records — SUBP-303-LAB-01

Laboratory identification: (TBD from ALC COC forms)

Requested items: - Original analytical reports for G21 samples - Chain-of-custody documentation received from ALC - Analytical methods used (spore trap analysis) - QA/QC documentation - Any communications with ALC re results - Accreditation/certification documentation

4) SERVPRO/Remediation Coordination — RFP-303-SERVPRO-01

  • Any communications with ALC re clearance timing
  • Clearance requirements received from ALC
  • Any ALC coordination for re-entry/PRV scheduling

G) Priority 3 — Supporting Discovery (Target: 90 days)

5) NY DOS Entity Records — REQ-303-DOS-01

  • Entity print for "ALC Environmental Inc." and/or "The ALC Group LLC"
  • DBA filings connecting entity names
  • Registered agent information
  • Officers/directors as of 2020-2022
  • Filing history

6) NYSDOL Mold Program — REQ-303-NYSDOL-01

  • Mold assessor license status (if applicable to ALC personnel)
  • Any certifications required for mold assessment work in NYC

7) Professional Certification Records — REQ-303-CERT-01

  • ABIH certification records for Jack Glass (CIH status 2020-2022)
  • Any other professional certifications relevant to PRV authority

H) Assignment & Status Grid (routing template)

Task (short name) Priority Method Owner Status Target Date On-Receipt Artifacts
ALC PRV package (full) P1 Subpoena Counsel Open +30d Native report, field sheets, COC, lab, calibration
ALC engagement docs P1 Subpoena Counsel Open +30d Contract, W-9, COI, invoices
ALC communications P1 Subpoena Counsel Open +30d All G21 emails (2020-2022)
Landlord ALC records P1 RFP Counsel Open +30d Contract copy, payments, correspondence
Lab analytical reports P2 Subpoena Counsel Open +60d Original reports, COC, methods
SERVPRO/ALC coordination P2 RFP Counsel Open +60d Clearance timing communications
NY DOS entity records P3 Reg. request Paralegal Open +90d Entity print, DBAs
NYSDOL mold program P3 Reg. request Paralegal Open +90d License status
ABIH CIH certification P3 Reg. request Paralegal Open +90d Glass certification records

I) Cross-References (White tabs)

  • WT-108 — ALC Post-Remediation Verification (PRV) — Insp. 2021-07-28; Report 2021-08-03
  • WT-108A — Mold Abatement Work Scope — Court-ordered 10-item scope (2020-12-08)
  • WT-109 — Olmsted Response to ALC — Aug 18, 2022 ("replete with misleading statements")
  • WT-110A — ALC "Additional Scope of Work" — Nov 2022
  • WT-112 — ALC Pre-Remediation Inspection — Feb-Mar 2020
  • WT-112A — "Re: Appointment and Mold Report" — Kowalewski email
  • WT-205 — Candice A. Kowalewski (Witness Profile)
  • WT-206 — Jack Glass, MS, CIH (Witness Profile)
  • WT-114 — Scope Manipulation Evidence Compendium — PRV central to arc
  • WT-303 — ALC Environmental (Corporate Profile)
  • WT-003 — Master Tracker (this page nested)

J) Bates Plan & Pinpoint Tasks

Bates Batches (prefix G21-ALC-)

  • 303-BATES-01: Contract/SOW/W-9/COI → G21-ALC-000001+
  • 303-BATES-02: PRV report (native) → G21-ALC-000100+
  • 303-BATES-03: PRV field sheets → G21-ALC-000200+
  • 303-BATES-04: PRV chain-of-custody → G21-ALC-000300+
  • 303-BATES-05: PRV calibration logs → G21-ALC-000400+
  • 303-BATES-06: Lab reports → G21-ALC-000500+
  • 303-BATES-07: Pre-remediation materials → G21-ALC-001000+
  • 303-BATES-08: Additional Scope (Nov 2022) → G21-ALC-001500+
  • 303-BATES-09: Communications (emails) → G21-ALC-002000+
  • 303-BATES-10: Photos (EXIF) → G21-ALC-003000+
  • 303-BATES-11: Personnel records → G21-ALC-004000+
  • 303-BATES-12: Entity/licensure records → G21-ALC-005000+

Pinpoint Tasks (mechanicals)

  • 303-PIN-WT108-A: Insert PRV page pins for sampling tables
  • 303-PIN-WT108-B: Insert PRV page pins for signatures
  • 303-PIN-WT108-C: Insert PRV page pins for "achieved clearance" conclusion
  • 303-PIN-WT108A-A: Insert WT-108A page pins for 10-item scope
  • 303-PIN-WT110A-A: Insert Additional Scope page pins
  • 303-PIN-WT110A-B: Insert Additional Scope signatories
  • 303-PIN-WT112-A: Insert Pre-Rem page pins
  • 303-PIN-WT112A-A: Insert email thread pins
  • 303-PIN-WT205-A: Insert Kowalewski witness profile anchors
  • 303-PIN-WT206-A: Insert Glass witness profile anchors

K) ESI Protocol — PRV Authentication Specifications

K.1 PRV Report Authentication Requirements

Component Requirement Why Critical
Native PDF Original file (not re-scanned) Metadata preservation
Digital signatures Verify signatory metadata Authenticity
Sampling tables Complete data for all 8 samples Supports "achieved clearance"
Conclusion language Exact text of clearance statement Central to WT-114 arc

K.2 Field Data Requirements

Document Required Fields Format
Field sheets Sample locations, times, volumes, pump IDs Native scans or PDF
COC forms Sample IDs, dates, times, signatures Native with lab receipt
Calibration logs Device IDs, calibration dates, certifying entity Native PDF

K.3 Laboratory Report Requirements

Component Requirement
Analytical method Identify spore trap analysis method
Detection limits Document LOD/LOQ
QA/QC Blanks, duplicates, lab certifications
Chain-of-custody Lab-received COC with signatures

K.4 Search Terms for ESI Collection

G21, 97 Green, 226 Franklin, ALC Environmental, Jack Glass, 
Candice Kowalewski, PRV, post-remediation, clearance, mold,
spore trap, sampling, 2021-07-28, 2021-08-03, remediation,
abatement, scope, additional scope, Olmsted, SERVPRO

L) Interrogatories — Proposed Categories (30 questions)

Category Question Count Topics
Engagement authority 4 Who retained ALC; scope of authority; payment terms
PRV methodology 8 Sampling protocol; locations; equipment; clearance criteria
Personnel 4 Glass role/authority; Kowalewski role; others involved
Pre-remediation 4 Initial findings; recommendations; scope basis
Communications 5 With landlord; with contractors; with tenant; internal
Quality assurance 5 QA/QC procedures; calibration; lab selection; validation

M) Deposition Topics — ALC Corporate Designee (30(b)(6))

Topic # Description
1 Corporate structure and legal name(s) used for G21 engagement
2 Personnel assignments and authority for G21 project
3 PRV methodology and clearance criteria applied
4 Sampling locations, timing, and protocols
5 Calibration and equipment maintenance procedures
6 Laboratory selection and quality assurance
7 Communications with landlord, contractors, and tenant
8 Basis for "achieved clearance" conclusion
9 "Additional Scope of Work" (Nov 2022) — basis and recommendations
10 Response to Olmsted findings (WT-109) if any

N) Phased Discovery Strategy (procedural only)

Days 1-30: Serve SUBP-303-ALC-01 and RFP-303-LANDLORD-01; meet-and-confer; confirm litigation holds at ALC; request privilege log.

Days 31-60: Lab subpoena; SERVPRO coordination requests; privilege review on communications; supplement PRV package gaps.

Days 61-90: NY DOS/NYSDOL/ABIH pulls; deposition notices for Glass and Kowalewski after core productions.

Days 91-120: 30(b)(6) deposition of ALC corporate designee; individual depositions.

Day 121+: Trial-prep mechanics (exhibit lists, Bates ranges, PRV demonstratives).


O) Non-Response Procedures (4-stage escalation)

Day +7: polite follow-up → Day +14: meet-and-confer letter → Day +21: motion to compel → Day +30+: sanctions request if ordered production not met.


P) Document Review Workflow (9 steps)

Receipt/logging → Preservation + hash → Privilege review → Relevance coding → Bates assignment → Load files → QC → Production → Integration (update WT-003; complete 303-PIN-* tasks; update WT-114 if relevant to scope manipulation arc).


Q) Key Evidence Targets (collection priorities)

Target Why Critical Source
PRV field sheets Authenticates sampling protocol; verifies locations ALC project file
Calibration logs Validates equipment accuracy at time of sampling ALC records
Lab COC Establishes sample integrity chain ALC/Lab
"Achieved clearance" basis Documents criteria applied for conclusion PRV report, internal docs
Glass signature authority Confirms authority to certify PRV Personnel records
Kowalewski field presence Confirms who conducted inspection Field sheets, HR records

END — White Tab 003 ▸ Entry — WT-303 Discovery Packet (ALC Environmental) v1.0