White Tab 112 — ALC Pre‑Remediation Inspection & Pre‑Award Communications (Feb–Mar 2020)¶
GUARDRAIL: WHITE — FACT REPOSITORY ONLY
Facts & source pinpoints only. No strategy, no argument, no legal opinions. All quotations are "as reported" unless exact text appears in a cited source.
A) Source Identification (from the face of the ALC report)¶
- Firm: ALC Environmental (The ALC Group, LLC d/b/a ALC Environmental).
- Report title: "Limited Water Intrusion Inspection."
- Location: 226 Franklin Street, Apartment G21, Brooklyn, NY 11222.
- Inspection date: February 07, 2020 (inspector: Candice A. Kowalewski, MPH).
- Report date: March 18, 2020 (Revised); addressed to Martin C. Kofman at American Package Company.
- Licensing statement (excerpt): "ALC identified visual microbial growth and water damaged materials. Since the impacted materials are greater than 10 square feet, NYS regulations require the work to be completed by a licensed mold remediator and then cleared by a licensed mold assessor." (Results & Recommendations section).
B) Timeline — Pre‑Award Communications & Report Issuance (facts from case files)¶
- Feb 7, 2020 — ALC inspection conducted at G21 (Candice Kowalewski, MPH).
- Feb 20, 2020 — "Smoking‑gun" email (verbatim excerpt) from Christian Gray to Violet Lautan (American Package Co.):
"Confirmed. When will you be receiving the mold report? How are you moving ahead with a third company without a mold report from the second company? Thank you."
(Sent 3:56 PM; subject: Re: Appointment and Mold Report.)
- Feb 24, 2020 — Scheduling of SERVPRO noted in timeline working file.
- Feb 27, 2020 — SERVPRO onsite/inspection (before ALC report finalized).
- Mar 18, 2020 — ALC report issued (Revised) to Martin C. Kofman.
Delivery note (current record): Working files indicate the ALC report was sent to the owner and not provided to SERVPRO; no record located in the file set of delivery to SERVPRO. (Update if a transmission record is later produced.)
C) "Smoking‑Gun" Email (verbatim, with source)¶
Date/Time: Thu, Feb 20, 2020, 3:56 PM
From: Christian Gray
To: Violet Lautan (American Package Co.)
Subject: Re: Appointment and Mold Report
Text:
"Confirmed. When will you be receiving the mold report? How are you moving ahead with a third company without a mold report from the second company? Thank you."
Context from the same timeline record: Violet had scheduled SERVPRO for Feb 27, before ALC issued its report on Mar 18.
D) Regulatory/Scope Statements (as stated in ALC's report)¶
- ALC documented "visual microbial growth and water damaged materials" and stated that because the impacted area exceeds 10 sq ft, the work must be performed by a licensed mold remediator and then cleared by a licensed mold assessor (NYS Mold Program), per the Results & Recommendations section of the report.
E) Why this record matters to chronology (facts‑only)¶
- The sequence is: ALC inspects (Feb 7) → Tenant objects to moving ahead without the report (Feb 20) → SERVPRO scheduled/onsite (Feb 24–27) → ALC issues report (Mar 18). This shows the contractor activity preceded the issuance of the licensed assessor's report.
- ALC's written statement that Level II‑type regulated work was required (licensed remediator + licensed clearance) appears in the report that issued after the SERVPRO visit.
(No inferences are drawn here; this tab preserves the dates, the email text, and the report language.)
F) Cross‑References (White tabs; facts‑only)¶
- WT‑001 — Master Timeline: add entries for Feb 7 (ALC inspection); Feb 20 (email); Feb 24 & Feb 27 (SERVPRO scheduling/visit); Mar 18 (ALC report issued).
- WT‑108 — ALC PRV (Aug 3, 2021): later "clearance" report; this tab precedes that report by ~17 months.
- WT‑205 — Candice A. Kowalewski (Witness Profile): inspector named on this ALC report.
- WT‑206 — Jack Glass, MS, CIH (Witness Profile): co‑signatory on ALC report (per ALC report).
G) Open Items for WT‑003 (Document Collection Tracker)¶
- Transmission proof: Email/cover letter showing exact transmission date(s) of the Mar 18 ALC report and all recipients (owner, adjuster, contractors). (Update delivery note above when obtained.)
- SERVPRO engagement chain: Written scheduling email(s) for Feb 24 and site‑visit record for Feb 27; SERVPRO job file opening documents.
- ALC attachments set: Confirm complete 17‑page ALC package is in evidence, including any photos/appendices referenced.
- License artifacts: Capture NYS mold remediator/assessor license snapshots relevant to February–March 2020.
END — White Tab 112 — ALC Pre‑Remediation Inspection & Pre‑Award Communications (Feb–Mar 2020) v1.1