White Tab 208 — Raheem Coleman (SERVPRO) — Witness Profile¶
GUARDRAIL: WHITE — FACT REPOSITORY ONLY
Facts & source pinpoints only. No strategy, no argument, no legal opinions. All quotations are "as reported" unless exact text appears in a cited source.
A) Professional Identity (facts‑only)¶
- Full Name: Raheem Coleman.
- Employer (period at issue): SERVPRO West Somerset County (franchise legal name to be verified from native records).
- Current Title (as recorded): Production Manager (as of 2025; verification from HR pending).
- Role in Matter (White): On‑site demo team supervisor/lead during the Jul 20–27, 2021 remediation window at G21 (exact job title to be confirmed in SERVPRO job file).
- Direct Contact (on file): 201‑725‑6612 — recorded in White (add native verification evidence to WT‑003 before any external use).
- Credentials/Licenses documented in White: Not on file (collect if any: IICRC, OSHA, state).
White contact rule: Contact data appears in White; native verification (HR or job file) is required before any use outside White.
B) Role & Timeline (G21 / 97 Green St. → 226 Franklin St.)¶
- Primary on‑site work period: Jul 20–27, 2021 (SERVPRO remediation window).
- Reporting chain (as recorded in White): Worked under Ronnie Garcia (SERVPRO lead/initial estimator at the time; employment status later changed). See WT‑207 for Garcia profile.
- Subsequent contact: May 11, 2023 — email re probe‑opening meeting (collect native .eml with headers).
Anchor tabs (facts‑only):
WT‑106 (Court‑Ordered vs Executed scope matrix), WT‑108 (ALC PRV — insp. Jul 28, 2021 / report Aug 03, 2021), WT‑109/110 (post‑PRV expert sequence), WT‑111 (re‑flood packet).
C) Documented Statements (as recorded; "as reported")¶
C.1 Reported field instruction (July 2021 work window)¶
Content ("as reported"): "Only remove one layer of drywall" and "only the bamboo layer of the flooring system."
Attribution: Reported by Christian Gray from an on‑site conversation with Raheem Coleman during Jul 20–27, 2021.
Source status: Referenced in WT‑106 scope‑comparison materials; native Coleman statement not yet collected.
Pinpoint/Bates: TBD — insert exact WT‑106 page once pinned → Task 208‑PIN‑106‑A.
C.2 Email contact — May 11, 2023¶
Context: Coordination re probe opening.
Action: Collect native .eml/.msg with full headers & thread; assign Bates → Task 208‑EML‑2023‑A.
Verification note: C.1 is reported in White and requires corroboration (SERVPRO work orders/daily logs/scope docs and Coleman confirmation) before any use outside White.
D) Source‑Tab References (White; facts‑only)¶
- WT‑106 — G21 Scope: Court‑Ordered vs Executed (records the "as reported" field limitation and ties to executed work).
- WT‑108 — ALC PRV (insp. Jul 28, 2021; report Aug 03, 2021).
- WT‑109 — Olmsted Response (Aug 18, 2022); WT‑110 — Olmsted Follow‑Up (Nov 07, 2022).
- WT‑111 — July 2023 Re‑Flood Email Packet.
E) Collection Targets (tracked in WT‑003)¶
E.1 SERVPRO Job File — G21¶
- Work orders & initial estimates: Original scope estimate; signed work authorization; amendments/mods.
- Daily production logs & activity reports: Jul 20–27, 2021 logs; crew lists; day‑by‑day notes.
- Timecards & crew rosters: Personnel, hours, supervisor assignments.
- Materials manifests & disposal records: Removed materials and disposal receipts.
- Change orders or scope directives: Written scope changes; authorization trail; comms re adjustments.
- Photographic documentation: Before/during/after sets; originals with EXIF; photo index/map.
- Final completion documentation: Completion certs; final inspection notes.
E.2 Scope‑Instruction Documentation¶
- To Coleman: Written work orders/field instructions; any field clarifications.
- To Garcia: Original estimation scope; Stipulation Exhibit 1 (Dec 08, 2020) if provided; alternatives.
- Written directives/logged instructions: Field notes/dailies; scope limitations; change orders.
- Electronic comms: Email/texts re scope; authorization chain.
E.3 Employment & Credentials (SERVPRO)¶
- Start date, role progression, current status; IICRC/OSHA/state training or licenses.
E.4 Internal SERVPRO Comms (G21)¶
- Project management comms; internal QC/inspection notes referencing G21.
E.5 May 11, 2023 Correspondence Set¶
- Native .eml/.msg w/ headers; calendar invite; attendees; follow‑ups. → Task 208‑EML‑2023‑A.
E.6 Supervisor Linkage — Ronnie Garcia (WT‑207)¶
- Current contact (if available); employment dates; scope handoff docs; authorization chain for instructions to Coleman.
E.7 Photographic Documentation — Enhanced Requirements¶
- Native files & EXIF; photo index/mapping; before/during/after sequence; photographer ID & chain of custody.
F) Contact & Service (administrative)¶
- Phone on file: 201‑725‑6612 (native verification pending).
- Employer: SERVPRO West Somerset County (franchise legal entity TBD).
- Counsel representation: Not documented in White.
Collection status:
- Contact: Recorded; verify natively.
- Work records / employment verification / scope documentation / May 2023 email: In progress in WT‑003.
G) Cross‑References (White; facts‑only)¶
- WT‑001 — Master Timeline (add Jul 20–27, 2021 work window; Jul 28/Aug 03, 2021 PRV).
- WT‑002 — Witness & Personnel Directory (Coleman entry; link to this tab).
- WT‑003 — Document Collection / Discovery Tracker (parent tracker for E.1–E.7 tasks).
- WT‑106; WT‑108; WT‑109; WT‑110; WT‑111 (sequence).
- WT‑207 — Ronnie Garcia (SERVPRO) (supervisor linkage).
H) Additional Context (facts‑only framing from White)¶
H.1 SERVPRO Chain of Command (G21 project; as recorded)¶
- Ronnie Garcia — SERVPRO lead/initial estimator on G21 at the time (formal title to confirm from job file).
- Raheem Coleman — on‑site demo team supervisor/lead during Jul 20–27, 2021; reported field instruction captured in WT‑106.
H.2 Scope Documentation Chain — Open Items (facts to collect)¶
- Source of estimation scope; whether Dec 08, 2020 Stipulation Exhibit 1 was provided; transmission of scope to field; written directives; authorization for any limitations.
H.3 Professional Context (Industry Standards — collection tasks only)¶
- IICRC S520 (mold remediation), OSHA worker‑safety regs, and any state/local rules were referenced elsewhere; collect and cite standards in WT‑003 for factual use. → Tasks: 208‑STD‑IICRC; 208‑STD‑OSHA.
H.4 Work‑Period Timeline Context (Jul 20–27, 2021)¶
- ≈ 21 months after the Oct 13, 2019 flood trigger.
- ≈ 7 months after the Dec 08, 2020 scope (PRV Appendix B baseline).
- Immediately precedes ALC PRV inspection (Jul 28, 2021) and PRV report (Aug 03, 2021).
H.5 Post‑Work Timeline Reference¶
- Aug 18, 2022 — WT‑109 (Olmsted response). Nov 07, 2022 — WT‑110 (Olmsted follow‑up). Jul 12–17, 2023 — WT‑111 (re‑flood emails/photos).
Section H reflects organizational/timeline context set out or implied in the White tabs cited above; no new facts are introduced.
I) Bates & Pinpoints (mechanical pass to finalize)¶
- WT‑106 — insert exact PDF page(s) where Coleman's reported instruction appears → Tasks 208‑PIN‑106‑A..B.
- WT‑108 — add pins for 7 indoor + 1 outdoor sampling, RH values, and "achieved clearance" language → Task 208‑PIN‑108‑A.
- May 11, 2023 email — assign Bates to native EML (headers + thread) → Task 208‑EML‑2023‑A.
END — White Tab 208 — Raheem Coleman (SERVPRO) — Witness Profile v1.6