Skip to content

Red Tab 103.1.A — System Readiness Checklist (Eight Systems)

GUARDRAIL: RED — FREEMAN STREET DAMAGES

Freeman Street opportunity-loss damages only. No G21 base damages, no enterprise multipliers.

Navigation: ← Return to Tab 103.1 (Exhibit Master Index)

PURPOSE & USE (Evidence‑Only)

Single‑page commissioning and evidence routing checklist for Karuna ∞ Freeman.

  • What this is: A calculation‑free readiness tracker mapped to the eight integrated production systems and the Corporate/Atmos exhibits in Tab 103.
  • What this isn’t: No dollars, no multipliers, no scenario math (all math lives in Tab 001/002).
  • How to use: For each system, check Ready / Deferred, complete the acceptance tests, and attach or link the exhibits named below (native formats + hash receipts).

A. EIGHT‑SYSTEM READINESS CHECKLIST

Mark one: ☐ Ready ☐ Deferred • Add links to exhibits/folders • Log SHA‑256 receipts to Tab 103 custody.

# System Commissioning Tests (pass criteria) Primary Exhibits (Tab 103) Owner Status
1 Audio (Immersive & Hybrid) Mains/nearfields response & phase; RT60/iso; console I/O & clocking; test session (track→mix→export); Dolby alignment verified EX‑DOLBY‑01 (room/speaker design approval – Sept 2024); EX‑PMC‑01, EX‑PMC‑DOLBY‑01 (monitoring validation); EX‑SWEET‑SCHEM‑01 (signal‑flow review); EX‑SWEET‑LETTER‑01 ____ ☐/☐
2 Video (Cinematic Multicam & Robotics) Robotics repeatability; AI auto‑tracking accuracy; camera control/tally/comms; timecode sync; redundancy failover EX‑PANA‑01 (coordination); EX‑PANA‑VISITS‑01 (site visits/tests); EX‑PANA‑LAMB‑01 (Kairos demo); EX‑PANA‑MILLER‑01 (projection design) ____ ☐/☐
3 Motion Capture (Performance & Real‑Time) Optical accuracy/coverage; capture→clean→visualize latency; real‑time render budget; broadcast sync EX‑MOCAP‑ROUGE‑01 (Rouge consult); EX‑OPTITRACK‑01 (OptiTrack channel support) ____ ☐/☐
4 Lighting (DMX & Atmospheric) DMX cue stacks; timing sync with audio/video; CT & intensity accuracy; atmos integration EX‑LIGHT‑KD‑01 (AV/IT integration); EX‑LIGHT‑KIP‑01 (scenic/lighting review) ____ ☐/☐
5 Projection (Immersive Mapping) Map accuracy/warp; render‑pipeline throughput; sync with lighting/audio; interactivity response EX‑PROJ‑NERO‑01 (3D projection tests); EX‑PROJ‑NGLD‑01 (virtual assets) ____ ☐/☐
6 Network & Orchestration (Backbone) Time‑sync across subsystems; QoS under load; security segmentation; cloud‑edge round‑trip baseline EX‑CINESYS‑ANGLE‑01 (CTO engagement); EX‑CINESYS‑LEBLANC‑01 (engineering session); EX‑CINESYS‑EQUIP‑01 (equipment list) ____ ☐/☐
7 Virtual Production & XR Digital Twin LiDAR geometry completeness; Unreal scene optimization; live stream quality/latency; interactive venue features EX‑XR‑NYCAP‑01 (3D capture); EX‑XR‑PLONSKI‑01 / EX‑XR‑SERVOSS‑01 (workflows/VR); EX‑XR‑NGLD‑02 (Unreal assets) ____ ☐/☐
8 Installation & Integration (Commissioning) Cross‑system timing; interconnect standards; emergency failover; change‑control/versioning EX‑SSL‑HOLLIS‑01 (site visits); EX‑SSL‑ZARETSKY‑01 / EX‑SSL‑DINNER‑01 (ecosystem validation); EX‑ARCH‑DCAP‑01 (AOR docs) ____ ☐/☐

Note: Where an exhibit code above does not yet exist verbatim in Tab 103, create it using the standard naming convention (e.g., EX‑PROJ‑NERO‑01_2025‑10‑11.pdf) and file it to the canonical path below.

Canonical filing path

/Red_Vol06/Tab103/Exhibits/{Tier}/{ExhibitID}/[native|red|deriv]/


B. GLOBAL GATES (Complete before marking “Ready”)

  • Dolby: EX‑DOLBY‑01 room/speaker design approval (Sept 2024) on file (native + hash)
  • Custody: SHA‑256 receipts present for every exhibit attached on this checklist
  • Chain‑of‑custody log: Updated in /Red_Vol06/Tab103/Custody_Logs/Tab103_MasterCustodyLog.xlsx
  • Privilege/PII review: Mark any A‑C communications & redact PII as required
  • Terminology: Use “room/speaker design approval” (not certification/listing); Karuna ∞ Freeman brand only
  • Cross‑refs live: Links from each checklist line to its exhibit folder (and to Tab 201 acceptance protocols, if needed)

  • Corporate/Enterprise (Tab 103) — Exhibits: 6‑tier validator stack (Dolby/Sweetwater/PMC/SSL/Panasonic/CineSys/JW Player)
  • Master Index (Tab 103.1): Place this page directly under 103.1; list it in the “Quality Gates & Tools” block
  • Technical Acceptance Protocols: Refer to Tab 201, LAYER 9 for per‑system procedures (no calculations)
  • Framework math: None here — see Tab 001/Tab 002 only

D. DOCUMENT CONTROL (YAML)


END — Red Tab 103.1.A — System Readiness Checklist (Eight Systems) v1.2