White Tab 110A — ALC "Additional Scope of Work" (Nov 3, 2022) — Tier‑1 Source Extraction (Facts‑Only)¶
GUARDRAIL: WHITE — FACT REPOSITORY ONLY
Facts & source pinpoints only. No strategy, no argument, no legal opinions. All quotations are "as reported" unless exact text appears in a cited source.
A) Document Identification (face‑page facts)¶
ALC_Additional Scope of Work_ November 2022.pdf
- Title (as supplied): "ALC Additional Scope of Work"
- Date: November 3, 2022 (transmittal date established through WT-120A / Sandercock correspondence sequence)
- Custodian/Authoring Entity: ALC Environmental (The ALC Group, LLC)
- Format: 1‑page PDF image (no embedded text) — text extraction not available in current copy.
- Intended Subject: Additional remediation items for 97 Green St., Apt. G21 following prior work and PRV.
Document state: Presence in the record is confirmed; this page is treated in the current project record as the one-page scanned attachment transmitted with WT-120A on November 3, 2022. Exact quotations, signatures, and any native attachment metadata still require OCR/native recovery.
B) What this document appears to be (facts we can state now)¶
- A one‑page image-only additional-scope page now pinned in the current record to November 3, 2022, the same date as WT-120A.
- In WT‑120A, Skaller states that the attached page was “a new scope of work that Jack prepared” and that Ed had indicated at the last apartment meeting it was acceptable as the remaining scope of work.
- Sandercock forwarded the WT‑120A package to Gray the same day and stated that she had separately sent “these things” to Olmsted.
- WT‑111 and WT‑106 discovery notes flag this page as the place where additional items (including kitchen floor language) appear; the current PDF remains an image so the exact text should still be captured via OCR/native before direct quotation use.
C) How 110A relates to surrounding tabs (timeline anchors)¶
- WT‑108 Appendix B (Dec 8, 2020) — baseline court‑filed scope: "Gut demolish rooms 1, 2, and 3 … including walls and flooring to the concrete slab" + living‑room probes/ceiling probes, etc. (reference text parsed from PRV Appendix B).
- WT‑109 (Aug 18, 2022) — Olmsted identifies items not completed (e.g., floor layers left; probes not cut).
- WT‑110 (Nov 7, 2022) — Olmsted agrees to a follow‑up scope and adds three items (hallway wall to window base; living‑room column/ceiling probe; bay closet probe with visible mold).
- WT‑110A (this tab, Nov 3, 2022) — one-page additional-scope page transmitted as the attachment to WT‑120A; to be text-authenticated and pinned for direct quote use.
D) Open facts to authenticate (what this page must ultimately show)¶
- Exact language of each added task (pin‑quotes once text recovered).
- Signature/author line (Kowalewski/Glass or other ALC signatory) and recipient list.
- Reasons/citations provided by ALC (if any) for the additions (e.g., moisture, observations).
- Distribution/acknowledgment (who received it; when).
- Execution status (authorized? performed? verified?) and how it reconciles with PRV and WT‑109 findings.
- Native attachment metadata confirming file identity and transmission path, if recoverable.
E) Cross‑References (facts‑only)¶
- WT‑108 / Appendix B (Dec 8, 2020) — original "agreed" scope ALC cites in PRV.
- WT‑109 (Aug 2022) — deficiencies one year post‑PRV.
- WT‑110 (Nov 7, 2022) — Olmsted's follow-up scope memo sent after the Nov. 3 package.
- WT‑120A (Nov 3, 2022) — transmittal email that describes the attached page as a “new scope of work that Jack prepared.”
- WT‑106 Discovery Packet — tracks "ALC Nov 2022 Additional Scope — kitchen floor pinpoint" as a required collection item.
- WT‑111 Discovery Packet — notes document presence and the need to authenticate the kitchen‑floor language.
END — White Tab 110A — ALC "Additional Scope of Work" (Nov 3, 2022) — Tier‑1 Source Extraction (Facts‑Only) v1.2