White Tab 206 — Jack Glass, MS, CIH (ALC Environmental) — Witness Profile¶
GUARDRAIL: WHITE — FACT REPOSITORY ONLY
Facts & source pinpoints only. No strategy, no argument, no legal opinions. All quotations are "as reported" unless exact text appears in a cited source.
A) Professional Identity¶
Full Name: Jack Glass
Legal name as sworn: John B. Glass, Jr. ("JOHN B. GLASS, JR., MS, CIH" — NYSCEF Doc No. 19)
Credentials (as listed): MS, CIH
Employer: ALC Environmental (The ALC Group, LLC)
Title (as listed): Vice President, Environmental Health & Safety (EHS)
Additional credentials (status to verify): LEED AP; NYS Mold Assessor license (number/status TBD)
Professional role in record: Senior environmental executive with report review/approval authority; co‑signatory on ALC reports related to G21.
Attribution: Identity, credentials, employer, title, and co‑signature role are taken from the WT‑206 source page and its referenced ALC reports for G21.
B) Role & Timeline (G21 — 226 Franklin St. / 97 Green St.)¶
Period of involvement reflected in White: Feb 2020 → Mar 2023 (two co‑signed ALC reports; a sworn affidavit; documented site meetings and correspondence through March 2023).
| Date (Mon DD, YYYY) | Event (facts‑only) | Source Tab (White) |
|---|---|---|
| Feb 07, 2020 | ALC initial water intrusion inspection (field by Candice A. Kowalewski, MPH). | WT‑112 |
| Mar 18, 2020 | ALC Water Intrusion Inspection Report issued; co‑signed by Jack Glass, MS, CIH. | WT‑112 |
| Dec 08, 2020 | ALC Work Scope referenced later as PRV appendix. | WT‑108A |
| Jul 20–27, 2021 | SERVPRO remediation work window (ALC monitoring window referenced). | WT‑108 |
| Jul 28, 2021 | Post‑Remediation Verification (PRV) inspection (field by Kowalewski). | WT‑108 |
| Aug 03, 2021 | PRV Report issued; co‑signed by Jack Glass, MS, CIH; conclusion recorded as "achieved clearance." | WT‑108 |
| Apr 11, 2022 | Site re‑inspection with Olmsted — "On April 11, 2022, I re‑inspected the Apartment with Olmsted" (Glass Aff. ¶12). Correspondence of Apr 27, 2022 reports Glass "agreed to a further scope of work and agreed to write it up" and, as reported, that both experts agreed the unit was not habitable. | NYSCEF 19; WT‑125 (E22) |
| Jun 13, 2022 | Reported position via Respondent's counsel: "Jack Glass says the original scope of work was done." | WT‑125 (E26) |
| Jul 06, 2022 | Affidavit sworn; filed Jul 28, 2022 in opposition to restoration. | NYSCEF Doc No. 19 |
| Oct 04, 2022 | Second site meeting with Olmsted (2:30 PM; access confirmed). | WT‑125 (E32–E36) |
| Mar 21, 2023 | Multi‑party unit walkthrough — owner, counsel, and expert joining at 2:00 PM. | WT‑125 (E41–E48) |
The WT‑206 source identifies the above co‑signature appearances and anchors the quantitative items summarized below.
C) Documented Reports & Signatures (facts‑only)¶
C.1 ALC Water Intrusion Inspection — Inspection Feb 07, 2020; Report Mar 18, 2020 (WT‑112)¶
- Inspector: Candice A. Kowalewski, MPH.
- Management signatory: Jack Glass, MS, CIH (co‑signed).
- Quantities (as stated): ≈ 62 sq ft visible mold; ≈ 750 sq ft water‑damaged materials.
- Recommended scope: Level II remediation; estimated $5,000–$10,000; 4–6 days; PRV required after completion.
C.2 ALC Post‑Remediation Verification (PRV) — Inspection Jul 28, 2021; Report Aug 03, 2021 (WT‑108)¶
- Inspector: Candice A. Kowalewski, MPH.
- Management signatory: Jack Glass, MS, CIH (co‑signed).
- Methods recorded: Visual / Olfactory / Moisture / Infrared / Spore‑trap air sampling (7 indoor + 1 outdoor); indoor RH ≈ 72.9–73.0%.
- Report conclusion: "This apartment has achieved clearance."
WT‑206 records the co‑signature role and the above elements for both reports. Exact page pinpoints will be filled against WT‑112/WT‑108 PDFs as part of the mechanical pass (see Section H).
C.3 Affidavit — Sworn Jul 06, 2022; Filed Jul 28, 2022 (NYSCEF Doc No. 19)¶
- Sworn as: "JOHN B. GLASS, JR., MS, CIH."
- ¶12 (exact text): "On April 11, 2022, I re‑inspected the Apartment with Olmsted and observed that Olmsted had conducted additional demolition of the ceiling and walls during his post remediation inspection. This damage was not present after ServPro completed the remediation work on July 27, 2021. I did not observe evidence that Olmsted had taken any standard regulatory precautionary measures when creating the holes in the Apartment."
- ¶15 (as previously ingested from the court‑file copy): owner‑compliance, no‑adverse‑microbial‑impact, and Olmsted‑recontamination opinions sworn in Glass's own name.
- Parallel accounts of the April 11, 2022 meeting (facts‑only collation): the sworn ¶12 describes observation of demolition attributed to Olmsted and does not mention further scope; the contemporaneous correspondence of both counsel records Glass's agreement to a further scope of work and Respondent's counsel's statement that "Jack is working on a potential new scope of work" (WT‑125, E22 and reading note 10). WT‑109 records that neither Glass nor Skaller attended Olmsted's post‑remediation inspection.
D) Licensure & Credentials — Verification Matrix (facts‑only; to be filled with native records)¶
| Credential | Issuer | Status shown in White | What to verify (native) | Task ID |
|---|---|---|---|---|
| CIH | ABIH | Listed in report signatures | Certificate number & active status (2020–2025). | 206‑LIC‑01 |
| MS | Academic degree | Listed | Institution, field, year. | 206‑LIC‑02 |
| LEED AP | USGBC | Referenced (not pinned) | Whether held; ID & status. | 206‑LIC‑03 |
| NYS Mold Assessor | NYS DOL | Not listed for Glass in file text | License number, issue/renewal status (2020–2021). | 206‑LIC‑04 |
E) Collection Targets (tracked in WT‑003)¶
E.1 Employment / HR (ALC Environmental) — P1 (30 days)¶
- Employment start date, position history, current status (title: VP EHS).
- Org chart bearing EHS reporting lines and co‑signature/QC authority documentation.
E.2 Credentials — P1 (30 days)¶
- CIH certificate & status; MS degree verification; LEED AP status; NYS Mold Assessor license (if applicable).
E.3 Report Development Materials — P1 (30 days)¶
- Drafts, redlines, review notes, and QC trail for WT‑112 and WT‑108.
- Glass ↔ Kowalewski correspondence regarding findings, methods, and clearance criteria.
E.4 ALC Policies / QA — P2 (60 days)¶
- Written procedures for report review/approval and PRV certification.
- Representative 2020–2021 reports co‑signed by Glass (pattern sample).
E.5 Court‑Related Materials — P2 (60 days)¶
- Affidavit re: G21 in hand (NYSCEF Doc No. 19, sworn Jul 6, 2022 — see §C.3); any deposition/testimony (if any).
F) Contact Status (administrative)¶
- Employer address: ALC Environmental, 39 W 29th St, 8th Fl, New York, NY 10001; Tel 212‑675‑5544 (company main).
- Direct contact / email: Not listed in White; to be collected via HR/native materials.
- Representation: Unknown (to be confirmed in discovery).
- Address data in the annexed affidavit materials (NYSCEF Doc No. 19): "Glassboro, New Jersey 08028" and "1152 Old Indian Mills Road" appear in the annexed contact/CV block; the email-domain text in the extraction layer is garbled — verify against the document image before any use.
G) Cross‑References (White tabs; facts‑only)¶
- WT‑112 — ALC Initial Water Intrusion Inspection (Feb 07, 2020; rpt Mar 18, 2020) — co‑signed by Glass.
- WT‑108 — ALC PRV (Jul 28, 2021; rpt Aug 03, 2021) — co‑signed by Glass.
- WT‑108A — ALC Work Scope (Dec 08, 2020) — appendix reference in PRV materials.
- WT‑106 / WT‑106A — Scope matrix & SERVPRO field incident video (remediation window context).
- WT‑205 — Candice A. Kowalewski, MPH (ALC) — field inspector paired with Glass.
- WT‑204 — Edward A. Olmsted, CIH, CSP — independent environmental inspector (baseline/response/follow‑up).
- WT‑125 — Olmsted Correspondence Record (Oct 2021 – Jun 2023) — meetings, reported positions, and the ¶12 collation.
- WT‑001 / WT‑002 / WT‑003 — master timeline, directory, and discovery tracker.
H) Bates & Pinpoints (mechanical pass to finalize)¶
- WT‑112 (Initial Inspection/Report): add page pins for 62 sq ft, 750 sq ft, Level II, $5,000–$10,000, 4–6 days, and PRV required. → Tasks 206‑PIN‑112‑A..F.
- WT‑108 (PRV): add page pins for methods (visual/moisture/IR; 7+1 spore‑traps), indoor RH values, and "achieved clearance" conclusion. → Tasks 206‑PIN‑108‑A..C.
- WT‑108A (Scope page): OCR signatories/recipients if needed; assign Bates. → Task 206‑PIN‑108A.
END — White Tab 206 — Jack Glass, MS, CIH (ALC Environmental) — Witness Profile v1.5